• Solutions
    • Pelton Turbines
    • Kaplan Turbines
    • Francis Turbines
    • Pump Storage Plants
    • Control System
    • Water to Wire
    • Modernization
    • Services
  • References
  • Media Center
    • Media Center
    • Blog
  • About Us
    • About Us
    • Career
    • Representatives
  • Contact
    • Contact
    • Inquiry Form
  • English
    • Français (French)
    • Deutsch (German)
    • Русский (Russian)
    • Español (Spanish)
    • Türkçe (Turkish)

Recent Posts

  • HPP Turbach – Industrial, Yet Municipal
  • New Life for the Hansenhütte Power Plant
  • GUGLER Powers Up the Dupinga River
  • Why “Bigger Is Always Better” Fails for Water Turbines
  • Na An Project Successfully Completed

About us

GUGLER Water Turbines GmbH is a leading supplier of – state of the art – turbine technology, supplying all types of Francis, Kaplan and Pelton turbines up to 40 MW per unit and related electro-mechanical equipment for small and medium sized hydro power plants (water to wire).

Follow us

  • LinkedIn
  • Instagram
  • Facebook
Skip to content
GUGLER Water Turbines GmbH
  • Solutions
    • Pelton Turbines
    • Kaplan Turbines
    • Francis Turbines
    • Pump Storage Plants
    • Control System
    • Water to Wire
    • Modernization
    • Services
  • References
  • Media Center
    • Media Center
    • Blog
  • About Us
    • About Us
    • Career
    • Representatives
  • Contact
    • Contact
    • Inquiry Form
  • English
    • Français (French)
    • Deutsch (German)
    • Русский (Russian)
    • Español (Spanish)
    • Türkçe (Turkish)

Author: Maksim Famin

New headquarters under construction

by Maksim FaminPosted on May 26, 2020October 22, 2026Comments are Disabled

Commissioning of completely revised 17 MW Hydropower Plant Nam Tha 4 in Vietnam

by Maksim FaminPosted on April 16, 2020October 22, 2026Comments are Disabled

Indonesia – 27 MW Krueng Isep HPP successfully commissioned

by Maksim FaminPosted on December 17, 2019August 24, 2026Comments are Disabled

Sri Lanka – two new hydropower plants commissioned

by Maksim FaminPosted on November 19, 2019August 24, 2026Comments are Disabled

Turkey – Major contracts received

by Maksim FaminPosted on November 5, 2019August 24, 2026Comments are Disabled

Philippines – Successful commissioning of 20 MW Bineng HPP

by Maksim FaminPosted on October 21, 2019August 24, 2026Comments are Disabled

[zek Feb 2019] Upper Austrians extend pioneering role in the Indonesian small hydro power sector

by Maksim FaminPosted on February 22, 2019August 24, 2026Comments are Disabled

Posts pagination

1 2 3

About us

GUGLER Water Turbines GmbH is a leading supplier of – state of the art – turbine technology, supplying all types of Francis, Kaplan and Pelton turbines up to 40 MW per unit and related electro-mechanical equipment for small and medium sized hydro power plants (water to wire).

Options and Links

  • Contact
  • Imprint
  • Change privacy settings
  • Revoke consents

Our Address

GUGLER Water Turbines GmbH
Gewerbepark 41
4101 Feldkirchen an der Donau
Austria
+43 7233 20933
info@gugler.com

Privacy Policy Copyright © 2026 GUGLER Water Turbines GmbH Inspiro Theme by WPZOOM
Scroll to top GDPR Cookie Consent with Real Cookie Banner
  • English
  • Français (French)
  • Deutsch (German)
  • Русский (Russian)
  • Español (Spanish)
  • Türkçe (Turkish)