Krueng Isep 3rd Unit
Indonesia
2019
Pelton Turbine

Number of units

1

Total Output (kw)

11946

Head (m)

310

Flow (m³/s)

4.55

Diameter (mm)

1100

Scope of Supply

Turn key (3rd unit vertical Pelton (6 jets), Valve, HPU, Generator, LV+MV Switchgears, Transformer, SCADA)
Copyright © 2026 GUGLER Water Turbines GmbH Inspiro Theme by WPZOOM
Scroll to top